FRC Flatwork Logo

Industrial Concrete Warehouse Flooring Contractors

Concrete Floor

FRC Flatwork

Our team of expert tradespeople have decades of experience in the installation of industrial concrete floors making FRC Construction one of Ireland's premier concrete warehouse flooring contractors. We use the very latest in American laser screed technology to ensure that we are one of leading warehouse flooring contractors in Ireland. We continuously invest in technology.

We specialize in the installation of high tolerance FM1 and FM2 (super flat) floors for storage and warehouse applications. To achieve these tight tolerance finishes, we use the Somero S940 laser screed and Somero SRS-4 laser screed. Somero are one of the leading manufacturers of laser-guided and technologically innovative machinery used in the concrete industry.

Services

Substrate Preparation

Plate bearing test carried out when necessary. Latest Leica LGD2 2D Laser System. Tracked Skidsteer with a level best box grader will utilise the Leica Laser system and final trim the dust/sand blinding to within 3mm accuracy. Movement Siren and onboard camera will help keep the worksite as safe as possible.
Vibrating rollers will ensure compaction and are also fitted with safety features similar to skidsteer. 

Free Movement Classification Floors

FM1, FM2, FM3, and FM4 specifications according to concrete society report TR34, 4th edition published in 2013. Achieved using the latest technology and highly skilled tradespeople.

Defined Movement Classification Floors

DM1, DM2, and DM3 specification defined movement floors, otherwise known as “superflat” floors are achieved only by using a combination of factors; 1. Concrete Mix Design, 2. Delivery and correct slump, 3. Pour Plan, 4. Installation Quality Control, 5. Using the latest laser screed technology, 6. Highly skilled concrete tradespeople, 7. Highly skilled concrete finishers and flatness crew.

External Pavement

Ground preparation will be done using tracked skidsteer, 2D or 3D total station systems will be utilised depending on the `particular project. Accuracy to 3mm will be achieved ensuring that the slab will be the correct constant thickness. This also ensures that wastage is not an issue. Concrete installation will be completed using laser screed technology where possible..

Technologies

FRC Flatwork uses the latest technologies in order to achieve the highest specification super flat floors. FRC Flatwork is constantly on lookout for new and innovative technologies that help us achieve the best results in the industry and in a cost effective manner in order to get the best value for our clients. Listed below is some of these technologies that are already in use at FRC Flatwork;

Leica IGD2 2D Laser System
Trimble Total Station 3D Technology
Case Tracked Skidsteer
Level Best Box Grader
Bomag Compaction Rollers
Somero S485 Laser Screed

Somero SRS4 Laser Boom Screed
Whiteman & Beton Power Trowels
Contop Dry Shake Spreader
Walk Behind Manual Spreader
Sealer Sprayers
Husqvarna Road Saws 

Somero SRS-4 Laser Boom Screed

We specialize in the installation of high tolerance FM1 and FM2 (super flat) floors for storage and warehouse applications. To achieve these tight tolerance finishes, as well as our unique experience, we use the SRS-4 Laser Boom Screed. 

Somero are one of the leading manufacturers of laser-guided and technologically innovative machinery used in the concrete industry. FRC Flatwork have invested in the SRS-4 Laser Boom Screed that will guarantee a top quality finish for your project. 

Case Tracked Skidsteer

Level Best Box Grader +/- 3mm accuracy on surface finish Levels ground with ease and unparallelled efficiency.
Great maneuverability in tight spaces Ten times faster than standard methods uning the Leica Geosystem laser system.
Available in 2D for accurate grading and 3D TPS for complex contours with several gradients. This results in huge cost savings for main contractor in terms of time and material while contributing to a safer work zone as there are no requirements for operatives on the ground close to moving machinery.

Health & Safety

Here at FRC Flatwork we ensure that on every project we undertake, health and safety is of the utmost priority and takes precedence over all other aspects of our industry. We consistently strive to set and achieve the highest health and safety targets in the industry ensuring that that the safety of both our employees and non employees are always a priority.

We ensure that all of our employees receive regular comprehensive induction and training in all aspects of health and safety and are compliant with all current health and safety regulations. All machinery is tested and checked regularly.

Safe work method statements are prioritized before commencement of any new project and all employees are made aware of the safe method we have adopted for each project before it's commencement. We constantly monitor health and safety throughout the duration of each project and identify and correct any potential risks as they arise ensuring a safe working environment for all parties involved. We view a zero accident count as a key performance indicator for each project.

Projects

Projects

Somero SRS 4

Technologies

Get In Touch!